
-
LocationGorlovka, blvd. Dimitrova, 74
-
CustomerPJSC
-
ArchitectAKB
-
General contractorLLC
-
Total area13 200 m2
-
Implementation period2013 - June 2014
-
Capacity1200 people
PALACE OF CULTURE PJSC "CONCERN STYROL"
As soon as possible, a comprehensive project was developed, including: changing the architectural appearance of the building, interior design and landscaping, exterior and interior engineering systems. p >
COMPLETED WORKS
DESIGN AND INSTALLATION:
- water supply and sewage systems
- heating, ventilation and air conditioning systems
- power supply systems (electrical equipment, electric lighting)
- security systems
- communication systems
- Automated Building Management System (BMS)
DEVELOPMENT OF THE CONCEPT:
- project and implementation of work to improve the adjacent territory
- interior design
MANUFACTURE AND INSTALLATION:
- facade structures
- decoration elements of the auditorium, dance halls, foyer
GENERAL CONTRACT SERVICES
DESCRIPTION OF THE OBJECT:
As soon as possible, a comprehensive project was developed, including: changing the architectural appearance of the building, design of interiors and landscaping, projects of external and internal engineering systems. Facade structures, entrance groups were created and mounted, landscaping of the adjacent territory was completed. Reconstruction of all internal premises.
Optional: In the concert hall, designed for 1200 spectators, wall and ceiling decor elements were designed and installed, new chairs were installed, the stage was reconstructed .